Write a proposal of approximately 250 words indicating your organization would like to bid on the project below. It will be addressed to Chad Blais, Deputy Director of Public Works and Municipal Utilities, 205 South Willowbrook Avenue, Compton, CA, 90220.
Be sure to include the scope of services you can provide, as well as your company overview, approach and methodology.
BACKGROUND
The Citys Water Utility Division is soliciting proposals from qualified consultants to design a new Booster Pump Station to push the discharge water from the reservoirs into the distribution system and maintain desired pressure in the system. The project includes preparation of engineering design drawings, technical specifications, special provisions, cost estimate, bid documents, and design support services during the construction of said project.
The City intends to reduce the age of potable water in four (4) existing interconnected 3,000,000 gallon steel tank storage reservoirs located at the Citys facility along Wilmington Avenue by cycling the water everyday 7 days (if possible based on demand). The Citys goal is to balance the need to maintain minimize water age through cycling of the water in the reservoirs and related water quality concerns, while also upgrading its ability to boost water into the distribution system to maintain adequate pressure to maintain fire flow requirements during emergencies.